Chengtu VI

From WikiSwire
Jump to navigation Jump to search
Chengtu VI
ID /IMO number 8918124
Type Cargo ship
Gross Registered Tonnage 13.237 tons
Builder Kvarerner Warnow Weft, Rostock DEU. Yard No. 470.
Delivery date 1993.
Hull Steel
Length 154.9 m. ovetall. LPP 146.9 m.
Width 23.1 m.
Propulsion mode Single screw.
Speed 16.5 kts
Deadweight 17,546 tons.
Power Diesel
Fuel MDO/HFO
Generator voltage 440 V
Generator Frequency 60 Hz
Launched Oct 2nd. 1992.

History

Built as "Kapitan E. Freyman"

1994. Renamed "Seal Mauritius"

1997. Renamed "Barnes Bridge"

1998. Renamed "Chengtu"

1999. Renamed "Island Chief"

2000 Renamed "Barnes Bridge"

2001. Renamed "Melanesian Chief"

2002 Renamed "ANL Progress"

2003 Renamed "Azteca"

2007 Renamed "Cape Hobart"

2009 Renamed "Kota Berjaya"

April 26th. 2015. Arrived at Alang for scrapping.

May 5th. 1915. Scrapping commenced by the Harikrishna Steel Corporation.

Service

Events / Stories

Images